Delivering Reliable Service with Certified, Brand-Name Products

Weishaupt-Logo
Honeywell-Logo
Siemens_AG_logo.svg
646c7c45-239b-451a-af9e-d54053918c50

DIVISIONS

Electrical

Residential Electrical

Sheet Metal Division

HVAC 

Fabrication

Mechanical

Plumbing

STEAM/Energy

CODE REPAIRS & CODE PIPING

Holders of:

National Board “NB” & “R” Stamp

ASME “S” & “U” Stamps

B31.1 Power Piping

65482e9a-ac80-465c-b240-0ea11568915b

PARTS

With a Complete Inventory and Fully Equipped Service Vehicles, We’re Always Ready

 

We can conduct a full steam system audit comprised of:

  • Full Steam Trap Audits
  • Check Piping for Heat Sinks
  • Check Heat Exchangers for present stall conditions.

Audits start in the boiler room and follow steam piping to process and condensate back to the feedwater tank or DA.

A custom booklet will be constructed for each facility comprised of 5 sections including:

  • Steam System Description,
  • Observations & Recommendations
  • Priority Repair List
  • Trap Audit
  • Reference Section.

We then set a meeting to review the booklet and its findings with the customer.

Turn-Key Installations

Boiler Room, House Keeping Pads and associated steam equipment

Installation of (Steam, Gas, Oil, Electrical, Water piping)

Build Any Access or Support Structures

Modify or Build New Stack, Breeching or Exhaust Ducts for all your needs

Start-up and Commission New Equipment

Hot Tapping up to 4” on water, steam, Air, Gas up to 200 PSIG

Pressure Vessel Code Repairs

Stainless Steel, Carbon & Inconel repairs, boiler re-tubes

3201faf3-ebef-4c75-955c-68cd9ffff6e6

Preventative Maintenance Programs

Annual, Semi-Annual, Quarterly or Monthly Inspections

BOILERS

DEAERATORS

BURNERS

OVENS

ROTARY OVENS

KILNS

THERMAL FLUID HEATERS

Oven Service

Line Production, Coaters, Pre-Heat, and Heat-Set Ovens

Before                            After

Boiler Controls & Automation

Full Boiler, Burner and Control Upgrade Including:

  • Flame Safeguards
  • Parallel Positioning
  • Water Level Control
  • First-Out Annunciation
  • Custom Built Touchscreen
  • PLC additions / upgrades
  • Boiler/Burner lead lag
  • Weishaupt WFM
  • Warrick liquid level controls
  • Lead Lag systems
Screenshot 2025-07-28 143722

Next Steps...

Call us today for expert boiler services—fast, reliable, and always professional.